Reline LIVE with Mike Whitehouse of ISCO


Episode Artwork
1.0x
0% played 00:00 00:00
Apr 23 2020 36 mins  
Don't forget to watch our webinar on our webpage: http://tvpipesolutions.com/reline-live/

Join us to discuss maintaining the correct pressure when grouting as well as not over loading HDPE. Mike is going to focus on the amount of pressure the liner will realize based on the grout density used to fill the annular space between the liner pipe and the existing host. We will also cover loading at a very basic 30,000 ft view.