On this episode, Justin Somelofske shares the details of NCSEA’s expert testimony filed in the 2024 Carbon Plan (CPIRP) proceedings with a focus on generation resources that require longer development timelines. In particular, Justin outlines the need for expedited offshore wind development activities in the state, along with the need for authorization of funding for early development of these facilities in NC’s current wind leasing areas. This is a can’t miss episode to stay up to date with the latest happenings in the 2024 CPIRP proceedings.
Additional Resources:
More details on Carbon Plan proceedings: https://energync.org/carbon-plan/
Energy News Network CPIRP Coverage: https://bit.ly/3xLSZg2
NCSEA’s Testimony on Long Lead Resources: https://bit.ly/4bk3epJ
Presented by NC Sustainable Energy Association. Hosted and produced by Matt Abele (Twitter: @MattAbele)
Be sure to follow us on Instagram at @squeakycleanpodcast.
Additional Resources:
More details on Carbon Plan proceedings: https://energync.org/carbon-plan/
Energy News Network CPIRP Coverage: https://bit.ly/3xLSZg2
NCSEA’s Testimony on Long Lead Resources: https://bit.ly/4bk3epJ
Presented by NC Sustainable Energy Association. Hosted and produced by Matt Abele (Twitter: @MattAbele)
Be sure to follow us on Instagram at @squeakycleanpodcast.