Oct 21 2024 26 mins 2
What happens when a project is designed and engineered based on a subsoils report created for another site, with wildly different conditions?
Adjacent sites may appear almost identical above grade, and yet have radically different subsoil conditions. It can be a false economy—and potentially catastrophic—to forgo a proper soils report specific to your site and instead base your design on unfounded assumptions.
Connect with Pro-Demnity:
- Leave a Review
- Follow us on LinkedIn
- Access our Risk Education Library
- Speak with a Risk Services Expert if you’re an Ontario architect seeking guidance for a risk management issue.
Thank you for listening.